Edge AI — no cloud, no subscriptionFCC & CE certifiedOEM/white-label available
Typically replies within one business day

AI Golf Camera Deployment Guide

From site survey to go-live in 6 steps —a clear, low-risk deployment path for golf facilities of any size.

6-Step Deployment Process

Every Golfeye deployment follows the same proven process —designed to minimize risk and maximize speed-to-value:

1

Site Assessment

We evaluate your facility's physical layout, identify optimal camera positions, and assess infrastructure (power, network coverage). Can be done remotely via photos/video or on-site.

  • Share facility photos, layout maps, and satellite imagery
  • Identify priority areas (practice area, signature holes, lesson bays)
  • Assess existing power outlets and WiFi coverage
You receive: Camera placement map, infrastructure requirements list, deployment scope document
1-2 weeks
2

Deployment Planning

Based on the site assessment, we design a detailed deployment plan including camera angles, power routing, network configuration, and a timeline.

  • Finalize camera positions and angles
  • Plan power routing (AC outlets vs battery positions)
  • Design network topology (WiFi access points if needed)
  • Set deployment date and logistics
You receive: Detailed deployment plan, budget confirmation, equipment list
3-5 days
3

Physical Installation

Camera mounting, power connection, and initial video quality verification. No construction, trenching, or structural modifications.

  • Mount cameras on tripods or fixed brackets
  • Connect power (AC or battery)
  • Verify camera angles cover target zones
  • Test video quality in current lighting conditions
You receive: All cameras physically installed and capturing video
1-2 days (typical 4-6 camera setup)
4

System Configuration

Software setup: detection zones, member profiles, app integration, display outputs, and branding customization.

  • Configure AI detection zones per camera
  • Set up member app integration (if WiFi available)
  • Verify video capture and shot tracer generation
  • Test end-to-end: swing →capture →shot tracer →app delivery
You receive: Fully configured system, camera positioning optimization, app integration verified
Same day as installation
5

Staff Training

On-site training session covering daily operation, basic troubleshooting, and how to onboard members.

  • System operation: power on/off, status monitoring, basic settings
  • Troubleshooting: common issues and quick fixes
  • Member onboarding: how to help members connect to the app
  • Content management: accessing and sharing shot tracer videos
You receive: Training materials, quick-reference guide, support contact info
2-hour session
6

Go-Live & Optimization

System goes live. We monitor performance for the first 2 weeks and optimize camera angles, detection zones, and settings based on real-world data.

  • Launch announcement to members/customers
  • Monitor AI detection accuracy and video quality
  • Adjust camera angles and detection zones based on usage patterns
  • Collect initial user feedback
You receive: 2-week performance report, optimization recommendations, dedicated support contact
Ongoing

Infrastructure Requirements Checklist

What your facility needs before deployment day:

RequirementDetailsWho Provides
Outdoor power outletsStandard AC outlet within 15m of each camera position (or use battery mode)Facility
WiFi coverage (optional)2.4/5GHz WiFi at camera positions for app sync and cloud backupFacility (if desired)
Mounting locationsFlat ground for tripods, or wall/post for bracket mounts —no drilling required for tripodsFacility
Camera hardwareGolfeye GE01 units, tripods/brackets, power cablesGolfeye
Software configurationAI setup, app integration, brandingGolfeye
Display monitors (optional)Video playback via Golfeye app on phone/tablet; USB export to computer for larger displayFacility (if desired)
Staff time for training2 hours for initial training sessionFacility

Common Deployment Challenges & Solutions

Issues that occasionally arise during deployment —and how we handle them:

ChallengeRoot CauseSolution
No power outlet near desired positionOutdoor power infrastructure not extended to course/range edgeUse battery mode (10 hrs) or install outdoor-rated extension; consult electrician for permanent outlet
Weak WiFi at camera positionCamera is too far from nearest access pointUse offline mode (full functionality); add outdoor WiFi extender if app sync is desired
Camera angle doesn't capture full flightObstructions (trees, netting) or suboptimal positionAdjust during site assessment; use 18 zoom to reframe from alternative position
Sun glare at certain times of dayCamera facing into sun during morning/eveningPosition cameras facing north/south; use lens hood; AI auto-adjusts exposure
Members unfamiliar with appNew technology adoption barrierQR code signage at each camera; staff-assisted onboarding for first 2 weeks

Frequently Asked Questions

A typical 4-6 camera deployment takes 1-2 days. Single camera setups can be operational within 2 hours. No construction, trenching, or structural modifications required.
No. Golfeye provides professional installation as part of the deployment package. For DIY-capable facilities, self-installation is straightforward with our step-by-step guide.
We deploy 1-2 cameras in your chosen test location, you collect real usage and engagement data, and we provide a detailed performance report at the end. No commitment to full deployment required.
A 2-hour on-site training session covers system operation, basic troubleshooting, and member onboarding. We provide written training materials, quick-reference cards, and ongoing support.

Deployment Resources

Start with a Free Site Assessment

We'll evaluate your facility remotely or on-site —and deliver a custom deployment plan at no cost or commitment.

?Free assessment?30-day pilot available?1-2 day installation?No structural mods
Request a Demo →